Precast Concrete M&E Access Formwork
Abbreviations and Conventions used Storewide
All Dimensions are in Metric Scale (mm); Conventions and abbreviations used throughout the Store:
L : Length | OD : Outer Dia | ID : Inner Dia | W : Width | H : Height | T : Thickness (also Height) | CS : Countersunk | G : Gauss
The terms Force or Pull Force are used interchangeably throughout the store and refer to the maximum observable or tested force against a 10mm thick grinded finish mild steel plate. The pull force will depreciate with thinner plates or sheets. The Pull force or Force is expressed in lbs, Kg or N.
[10N (Newtons) = approx 1 Kg = approx 2.2 lbs Pull Force]
- Nylon formworks for M&E Access holes in precast concrete
- 50, 75, 100mm Diameter formworks from 65 to 200 Kg clamping force
- Simply place on the steel platform at a suitable location prior to pouring concrete and create perfect access holes
- A Supreme Magnets innovation