Skip to content

Country

Click to Whatsapp

Operating extended hours on Whatsapp. No calls.

Ringing Telephone Icon
Click to Call

Mon-Fri: 10am to 6pm (GMT+8Hours).

Click to Email

Usually replies within 24 hours.

The Quaint Magnet Shop
Click to Locate

Visit us in-store, Mon-Fri: 10am to 6pm (GMT+8 hours).

DHL WW Delivery
DHL Express Worlwide

Slashed rates. Doorstep delivery in days with tracking.

Rotating Globe
Serving 224 countries

Wherever you are located, we'll be there in days.

Secured Checkout
SSL with PDPC

Secured checkout with your preferred payment options.

trusted Brand - Supreme Magnets
Highly Reputed

We're fussy about our reputation.
Click to check our Google reviews.

Precast Concrete M&E Access Formwork

Abbreviations and Conventions used Storewide

All Dimensions are in Metric Scale (mm); Conventions and abbreviations used throughout the Store:

L : Length | OD : Outer Dia | ID : Inner Dia | W : Width | H : Height | T : Thickness (also Height) | CS : Countersunk | G : Gauss

The terms Force or Pull Force are used interchangeably throughout the store and refer to the maximum observable or tested force against a 10mm thick grinded finish mild steel plate. The pull force will depreciate with thinner plates or sheets. The Pull force or Force is expressed in lbs, Kg or N.

[10N (Newtons) = approx 1 Kg = approx 2.2 lbs Pull Force]

  • Nylon formworks for M&E Access holes in precast concrete 
  • 50, 75, 100mm Diameter formworks from 65 to 200 Kg clamping force
  • Simply place on the steel platform at a suitable location prior to pouring concrete and create perfect access holes
  • A Supreme Magnets innovation
Have a question? Prefer a Quote?